The ASCO 7000 Series generator paralleling control switch gear is designed to be the world’s most intelligent and advanced multiple-engine power control system.
With the growth in blade servers with dual or triple power supplies, a single rack of equipment can easily produce dozens of power cords to manage—and an appetite for 20 kW or more of reliable power.
Helping companies plan, design, operate, and eventually refresh or repurpose their data centers more efficiently and effectively is a core part of Eaton Corporation’s mission. 
Caterpillar Inc. has released a new version of SpecSizer, the popular software tool that helps engineers select a competitively sized generator set for electric power projects.