The 120,000-square-foot, 6-MW Lon1 data center located in Feltham, London, was acquired in March 2018, and, within five and a half months, i3 had completed the modernization.
Typically, edge will be installed from two to 10 rack installations operating at 7 to 25 kW per rack. Whereas engineering companies have been designing for campus installations with 15 engineers per project, now the same 15 engineers will be installing 25 locations within urban and remote regions.
Power Xpert SPD, the latest addition to Eaton’s family of surge protective devices, protects critical equipment from potentially devastating surge events.
Interestingly, the introduction of modular data center designs has, perhaps as an unforeseen consequence, begun to provide a conduit for expanding the construction talent pool.
NextDC provides enterprise-class colocation services to local and international organizations. In July 2012, its M1 Melbourne data center — a 15MW hyperscale colocation facility went live.