PowerSecure’s newest version of its PowerBlock proprietary generator system is fueled by a precision blend of natural gas and diesel fuel (“bi-fuel”) and has a powerful Tier 4 Interim engine—all in a factory-certified package.
The ASCO 7000 Series generator paralleling control switch gear is designed to be the world’s most intelligent and advanced multiple-engine power control system.
Should data centers install photovoltaic (PV) solar arrays to provide electric power? The answer for some data centers is an unqualified “yes.” Companies and facilities that are planning to install, or have installed, PV systems to provide some portion of needed power include i/o Phoenix One, Google, AISO, Sonoma Mountain, Microsoft, Cisco Systems, BendBroadband Vault, DataScan Technologies, Facebook, and Intel.