Involta recently announced its acquisition of a 24.5-acre site housing an existing data center in the Green Bay region. Through this acquisition, Involta will implement a multi-phased approach to ultimately extend the current data center footprint to an expandable campus with up to 20 MW of capacity. The future campus is poised to meet rising enterprise colocation demands with the Involta SecurePower colocation model, which provides mission-critical data center space coupled with industry-leading power, security and connectivity services directly embedded into its facilities.
Located just 40 minutes from Green Bay, the campus project will support the fast-growing needs and performance requirements of critical high-tech industries with the colocation and services needed for enterprise workloads and AI applications. In addition, the location's proximity is highly desirable for edge deployments, in which Involta is considered a tier-two market pioneer. The area provides a low-risk zone with moderate temperatures to help regulate power demands, along with attractive tax incentives and the recent designation by the Biden administration confirming the state as an official U.S. Regional Tech Hub (RTH).