This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
The Room Alert 3S is Avtech’s most economical environmental monitor with the smallest footprint and the highest security features, including HTTPS, TLS, and SNMP v3.
For most data centers, cooling used to be pretty straightforward: A CRAC unit kept the server room cold enough that staff often wear sweaters to work no matter the outside temperature.
The BAC Nexus Modular Hybrid Cooler was designed to minimize maintenance cost by reducing spray water volume by up to 60% by allowing accessibility to all components at the front of the unit and by operating dry when temperature and climate allow.
Allowances for data center cooling temperatures have risen steadily in recent years, giving operators greater flexibility to benefit from lower power, infrastructure, and operating costs.
On Demand As organizations realize the value of modular construction and scalability, data and communications infrastructure continues to evolve. By using prefabricated components that can be easily, quickly, and cost-effectively reproduced, companies can expand their facilities based on their bottom lines rather than their predetermined timelines. But, along with growth comes increased heat load and rack density. So, what’s the secret to keeping energy costs down and availability up while new infrastructure is installed and connected?