When it comes to mechanical design and construction, it doesn’t get any more demanding and exacting than building the heating, cooling, and ventilation systems in a gigantic data center.
Eighteen thousand feet of welded steel HVAC piping; 30,000 weld inches; 60 tractor-trailer loads of piping delivered to the jobsite: truly, building out a mechanical system for a large-scale data center can be a mammoth undertaking.