The enclosure can be separated into three sections — one section can be independently removed in the field if a major generator set component replacement is required.
Skillfully negotiating colo contracts involves structuring both the business and delivery terms to meet your needs, but the final contract must capture those terms in clear, enforceable language.
Microsoft’s new cloud region in Sweden will be powered by 100% renewable energy
June 7, 2021
By choosing a renewable fuel, Microsoft expects at least 45% lower net carbon dioxide emissions compared to conventional diesel fuel at its Swedish data centers.
The plug-and-play design of the generator set and aftertreatment system simplifies the design and specification for the emergency power system within the overall project.
Now available for 60-Hz applications in North America demanding up to 1000 kW of standby power or 910 kW of prime power, the Cat XQ1140 power module features a twin-pack design.
Test your knowledge of generators and their role in on-site prime power and microgrids in the 21st century with this 10-question quiz from Rosendin Electric.
The first model in the 5000 series is the 5008C-E30TAG, an eight-cylinder, inline, 60-Hz offering that’s available as 900- and 1000-kWe standby power nodes.