Integrated Design Group Completes Data Center Construction for University of California at Santa Barbara
Integrated Design Group (ID) has announced that it has completed construction at the North Hall Data Center located at the University of California at Santa Barbara (UCSB).
As a fully integrated design firm, ID provided architectural and MEP design services for the research data center renovation and expansion. Integral to the university’s computing operations, the data center, which contained enterprise computing capabilities and all campus network connections, was fully operational during the project, allowing the university community to access the servers normally and not cause disruption to the institution’s computing.