The T5@Atlanta data center is currently under construction and available for lease. Click onhttp://oxblue.com/pro/open/holder/t5atlantato view the progress via web-cam. The available Tier 3+ data center will feature
  • 6.0 MW critical, expandable to 7.5 MW critical
  • Rack installations September, 2011; fully commissioned November, 2011
  • 100,500-sq-ft purpose-built data center building
  • 52,000-sq-ft of 36 in. raised floor production space
  • 20’ Clear height above 36 in. raised floor
  • Structure/roof built to minimum wind loads of 146 mph (Miami-Dade County)
  • Natural and man-made security measures with 150’ setback
  • Densities of 120 to 200 Watts/sq ft
  • Designed to LEED Silver Certified