- Colocation of 100 racks / 500 KW (approximate).
- Concurrently maintainable architecture
- Planned occupancy of 1/2011
- Power availability, architecture, & scalability critical.
- Installed generator capacity and architecture (e.g N, N+1, 2N, etc.).
- Delineate i) networks installed and ii) available at curb.
- Budgetary asking price/rate in $/KW-Month of critical load.