Air-side economizing in data centers has been a hot topic for a few years now. Some projects never realize the total energy savings promised for a variety of reasons; typically it starts with the general contractor “value engineering” part of the cooling system design out, or the contractors trying to cut costs, or the engineering group over estimating the total energy savings. This white paper discusses why these projects fail to deliver the promised savings and how to improve their designs.