Right-Sizing Legacy Power Systems in Data Centers
Date: Tuesday, April 22, 2014
Time: 2:00 PM ET (Convert to your timezone)
Duration: 60 minutes, including LIVE Q&A
Continuing Education: 1.0 PDH Certificate of Completion*
More efficient IT and UPS hardware, more efficient cooling systems, and energy efficiency measures like server virtualization, have reduced the power system load in many legacy data centers. How can this negatively affect the proper operation and efficiency of the power system? What reasonable changes can be made to right-size an under capacity power system?
On the flip side, many owners want to install more IT capacity than the legacy power system is designed to supply. How can we expand the power system?
By attending this webinar, you will learn about:
- What are the undesirable effects of operating a data center power system at a low percentage of capacity?
- What are the proven methods of right-sizing an under loaded data center power system?
- What are proven methods of expanding a legacy data center power system that is operating at capacity?
Can't attend live? Register to view the webinar on-demand!
*It is up to each individual to verify whether a given course is approved by their state licensing board.
|
Speaker: Christopher M Johnston, PE |
Sponsored by: |