Emerson Network Power, a business of Emerson reports that independent tests prove its ASCO 7000 Series Power Control Systems (PCS) operate during, and after, severe seismic shake table testing.

Since 2000, International Building Code (IBC 2000, 2003, 2006 and 2009) standards for seismic certification require “proof” that critical mechanical, electrical and plumbing equipment will operate after a simulated seismic event. “Proof” is actual shake table testing of a system and its components, rather than solely an engineering analysis. The seismic standards also require that equipment endure higher ground acceleration levels, or risk being red tagged during inspection, which may delay issuance of a building certificate of occupancy.

ASCO 7000 Series Power Control Systems have been certified on a tri-axial seismic simulator that punished the equipment with thousands of pounds of force. Low and medium voltage Power Control Systems operate even during a simulated seismic event, even though IBC codes do not require such operation. For critical facilities, such as hospitals, the ability of transfer mechanisms to function during a seismic event could be literally life saving.

Also, the equipment was fully cabled throughout testing on the shake table. A cable attached to the Power Control System’s top supplied it with rated ampacity, which raised the PCS’s center of gravity and added weight. Testing with fully rated cables proves the cables did not loosen from their lugs-an important factor when considering seismic certified equipment.

When qualifying on a shake table, testing must adhere strictly to AC156 criteria for non-structural systems and components. Equipment that has qualified via the Telcordia GR 63 standard may need to be de-rated.

IBC standards for special seismic certification of electrical equipment can be game changers for consulting engineers. To minimize their exposure to risk, they need to address four critical issues to ensure their projects meet code and to make certain they protect themselves:
  • Familiarize themselves with evolving seismic code standards,
  • Develop well-written specifications that account for ground acceleration and other seismic data for a site,
  • Work with contractors on a quality assurance program, and
  • Specify equipment properly certified for the specific building location.
If equipment is not properly certified and does not comply with code standards, an inspector has a legal right to withdraw the certificate of occupancy, even though the building may be occupied. The insurance company could declare the building uninsurable, so risk and liability lie not only with consulting engineers, but building owners, contractors, project engineers and critical equipment manufacturers. If the equipment fails to operate after a seismic event, it could result in physical damage and perhaps loss of life. Insurance claims could be, and have been, denied.
You must register or login in order to post comments.

Multimedia

Videos

Image Galleries

The Adventures of Kip and Gary

Diane Alber takes a humorous view of data center operations in her comic strip Kip and Gary. In the comic strip, Kip and Gary navigate problems familiar to data center professionals. You can see more at http://kipandgary.com/blog/

11/09/11 2:00 PM EST

Part 1: The Economics of Close-Coupled Cooling in the Data Center

Mission CriticalON-DEMAND: This presentation will detail the economics involved with each solution, CAPEX, OPEX, Total Cost of Ownership and payback to help make a complex challenge fundamentally easier to solve.

THE MAGAZINE

Mission Critical Magazine

march 2012 cover

2012 March-April

Mission Critical's latest issue is now available! Check it out!

TABLE OF CONTENTS SUBSCRIBE

PUE

Our Measured PUE is
See Poll Results Poll Archive

THE MISSION CRITICAL STORE

maintaining-mc.gif
Maintaining Mission Critical Systems in a 24/7 Environment, 2nd Edition

This book offers relevant insight into the Mission Critical Environment with an emphasis on business resiliency, data center efficiency, and green power technology.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Mission Critical Buyers Guide

Mission Critical's Buyers Guide: Find equipment and services for data center and emergency backup power applications. Click HERE to go to be taken to the MC Buyers Guide today!

STAY CONNECTED

facebook logo  LinkedInYouTube