Emerson Network Power Debuts ASCO PowerQuest Test Reports

Emerson Network Power debuted its ASCO PowerQuest Test Reports designed to help facilities comply with NFPA1, NEC2, and JCAHO3 reporting requirements for on-site power system testing, operation, load profiling and peak load shaving.

ASCO PowerQuest Reports automate the manual, time-consuming data logging required to comply with NFPA 99 and 110 for exercising emergency power systems, NEC 220.87 for documenting actual on-site power demand load, and JCAHO requirements for helping ensure reliable power for life safety loads.

The Reports’ data format parallels the requirements of reporting codes and standards. It includes monthly testing, peak load shaving, frequency and test length, date and time of test, equivalent loads (load banks), load run/banks for diesel-powered emergency power systems only, and cold starts.

The PowerQuest Reports also provide three additional, high-value applications. First, they capture data on the operational integrity of selected power system equipment, such as a transfer switch, or even its components. Second, they automatically log data during actual power outages to help meet exercising requirements when manual data logging may not be possible or accurate. Third, they provide data that can be used as a diagnostic tool to determine the cause of operational issues and as a predictive tool for maintenance and failure analysis.

With the touch of a single button or upon actual utility failure, the reports log, compile, interpret, archive and distribute data captured from engine-generators and automatic transfer switches. Parameters include percent of load, compared to 30 percent of genset nameplate rating, engine exhaust temperature, testing duration and frequency, a long list of time delays, voltage and amperage for each phase, and automatic transfer switch transfer and re-transfer times.

ASCO Reports record time-of-use load profile data 24/7. They process the data and produce a 30-day report that shows load demand branch-by-branch and for the entire emergency power system. The data show day-to-day and seasonal load demand variability of building, mechanical and clinical systems. When connected to an energy management system, ASCO test reports can show load demand for normal power for an entire campus.

Accurate and precise, test reports help eliminate the need for in-house personnel using clipboards and stopwatches, human error, renting multiple ammeters or out-sourcing the work.

ASCO reports comprise a series of graphs, charts, and tables and are compatible with any on-site power system.

Reports include software, ASCO Engine Gateways, and a 72E Ethernet connectivity module at the controller and power manager interface for automatic transfer switches. They can be integrated into virtually any on-site power SCADA4 system, or be configured independently. The reports use the same communications paths as automatic transfer switches and gensets, and can be operated remotely from virtually any computer screen, or at the power system. The reports criteria and performance thresholds can be set by the operator.

1. National Fire Protection Association, NFPA 99 (Health Care Facilities) and NFPA 110 (Standard for Emergency and Standby Power Systems)
2. National Electrical Code Article 220.87
3. Joint Commission on Accreditation of Healthcare Organizations
4. Supervisory Control and Data Acquisition
You must register or login in order to post comments.

Multimedia

Videos

Image Galleries

The Adventures of Kip and Gary

Diane Alber takes a humorous view of data center operations in her comic strip Kip and Gary. In the comic strip, Kip and Gary navigate problems familiar to data center professionals. You can see more at http://kipandgary.com/blog/

11/09/11 2:00 PM EST

Part 1: The Economics of Close-Coupled Cooling in the Data Center

Mission CriticalON-DEMAND: This presentation will detail the economics involved with each solution, CAPEX, OPEX, Total Cost of Ownership and payback to help make a complex challenge fundamentally easier to solve.

THE MAGAZINE

Mission Critical Magazine

march 2012 cover

2012 March-April

Mission Critical's latest issue is now available! Check it out!

TABLE OF CONTENTS SUBSCRIBE

PUE

Our Measured PUE is
See Poll Results Poll Archive

THE MISSION CRITICAL STORE

maintaining-mc.gif
Maintaining Mission Critical Systems in a 24/7 Environment, 2nd Edition

This book offers relevant insight into the Mission Critical Environment with an emphasis on business resiliency, data center efficiency, and green power technology.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Mission Critical Buyers Guide

Mission Critical's Buyers Guide: Find equipment and services for data center and emergency backup power applications. Click HERE to go to be taken to the MC Buyers Guide today!

STAY CONNECTED

facebook logo  LinkedInYouTube