Design collaboration between the owner/operator and the electrical and mechanical engineers in the design and construction processes of two large Sabey Data Center Campuses—one in East Wenatchee, WA, and the other in Ashburn,VA—was key to the success of the projects. In both these projects, the owner, MEP, and architectural team, and construction and operations teams collaborated to form a fully integrated data center team, producing offerings at various Tier levels, including turnkey and powered shell spaces.
Today, the Wenatchee campus Phase 1 is already built and populated with initial tenants, and the Ashburn Campus is designed, permitted, and ready for construction.