Watch as I gaze into my crystal ball; nine predictions for 2010.
If you want to know what I think of predictions read L.
Gordon Crovitz's December 29th column in the Wall St. Journal. Crovitz
quotes Roman engineer Julius Sextus Frontinus in 10 A.D, "Inventions have
long since reached their limit, and I see no hope for further
developments." Frontinus's prediction heads a list that Crovitz calls his
Top 10 Worst Technology Predictions. Others on the list include Bill Gates,
H.M. Warner, Thomas Watson, and Sir Alan Sugar, who predicted that the iPod
would be "dead, finished, gone, kaput" by Christmas 2006.
Technology editors are not immune. I'm frequently sent links
skewering one editor in the PC space for making light of the computer mouse
when it was introduced in 1984. This is why I held off making my predictions
for 2010 until the day when one of them came true.
1. We will see increased government involvement in the data
center space. On January 6, 2010, Department of Energy (DOE) Secretary Steven
Chu announced that the DOE would spend $47 million taken from the American
Recovery and Reinvestment Act (ARRA) on data center projects. These funds would
support research projects in the private sector and be matched by more than $70
million from large corporations active in the data center space.
In addition we can expect to see government-run data centers
start to catch up with their commercial counterparts. Closing this gap will be
necessary, if the government is to pursue efforts to further regulate the
industry, which it will.
2. End users will continue to pursue a variety of strategies
to ease the pressure imposed on their data centers by rising electric costs,
increased complexity, and the prospect of cap and trade and other government
regulations. They will increasingly turn to colocation and hosting solutions,
in spite of the difficulties of raising capital, and cloud computing and SaaS.
These changes will drastically reshape the data center landscape
3. Water considerations will become as important as energy
in planning and running data centers. It's no surprise that I would make this
prediction. Water began to emerge as a recurring theme in my blog as long ago
as April. Others realized the importance of this issue long before then.
4. IT and facilities personnel will not learn to
communicate, but failures on both sides will lead to all sorts of enterprise
problems. Poor designs, construction and/or maintenance will contribute to some
major outages on the facility side. DNS attacks, security breaches and network
issues will grow in severity. The Department of Homeland Security, which is
responsible for protecting civilian computer systems, suffered 850 cyber
attacks in the 2 years from 2005 to 2007, and this trend will not abate.
5. Utility performance will cause headaches. Many rate
increases will approach double digits, and some will exceed 20 percent. Even
so, the nation will experience at least one major outage in 2010. This failure
will stimulate Smart Grid development. Increasingly, it will be seen as a
no-brainer that the Smart Grid extend all the way to the server level. After
making four safe predictions, I'm out on a limb here. I'm also picking the Mets
to win the 2010 World Series.
5. Pressure will continue to mount for LEED to issue a
certification that is more appropriate for data centers. Climategate does not
affect the business case for green and sustainable development. Similarly the
world's failure to build consensus at Copenhagen will not slow momentum in this
area.
6. Onboard UPS and data center distribution will start to
gain traction, and colos, enterprises, and other data center operators will
begin to adopt designs developed for truly big and dense data centers.
Similarly, more data center operators will make efforts at attaining the kind
of super-low PUEs that only operations like Google have attempted. Look for
multiple announcements of PUEs below 1.0 achieved by including on-site
generation and free-cooling in the calculations.
7. Solutions that made inroads in 2008 and 2009, including
containerization and modular data centers, contained rack rows, and other
cooling solutions will find numerous new applications, as they will come to be
seen as less than exotic. Vendors will improve these products to make them
reduce the complexity of these and other infrastructure products. For instance,
containerized data center concepts will evolve beyond the crude shipping
container retrofits we have seen so far.
8. Not only will Data Center Pulse announce the results of
its Chill Off 3, but one or more industry groups will apply this model of
performance-based testing to other data center systems.
9. PUE will gradually give way to another, more holistic,
data center metric that will address compute performance, capital and
efficiency optimization and TCO.
These predictions were developed with input and guidance
from other famous prognosticators, including Ebay's Dean Nelson (also the Data
Center Pulse), HP Mission Critical Facilities's Peter Gross, Gilbane's Dennis
Cronin, Power Management Concepts’s Peter Curtis, and Jacobs's Kevin Dickens.
By: Dennis Cronin
Posted: January 7, 2010 10:13 AM
Mission Critical construction costs will remain low (10-20% below 2008 peak levels) thru June of 2010 as manufacturers address their excess capacity that has not been idled.
On or about June most excess capacity will be consumed and manufacturers will focus on building their backlogs so you can expect lead times for materials and finished products to begin increasing rapidly.
Trade contractors will be tracking much the same trend plus/minus a month.
As Manufacturers, materials suppliers and tradesmen get busy prices will also begin to rapidly increase.
Monthly increases in quoted costs of 3-5% in the second half of 2010 could be expected.
These costs and the increased lead times will only be mitigated as suppliers become confident in the market and begin to reactivate idle capacity.
By year end expect to see skilled labor shortages in select markets particularly where large Federal stimulus projects begin to kick in.
So what does your crystal ball say?
By: John Wilkes
Posted: January 7, 2010 4:12 PM
By: Kevin Heslin
Posted: January 15, 2010 4:57 PM
Thanks for reading.